Tangshan Aojie Petroleum Machinery Equipment Manufacturing Co., Ltd.

        Your present location:HomeProductsWell Control Equipment / Mud Gas Separator/Poor Boy Degasser
        Products
        • Name: Mud Gas Separator/Poor Boy Degasser

        Detailed Description of Aojie Mud gas separator

        1.Control delivery of gas to the flare line 
        2.Control of retention time of gas-cut mud in the vessel

        3.Promotes safe drilling environment 
        4.Efficient removal of free gas 
        5.Control delivery of gas to the flare line


        Features

        1.Large effective vessel capacity

        2.Removal of dangerous H2S and other poisonous gas

        3.Baffle plates in vessel

        4.Customized specification

        5.Back pressure manifold with flare ignition line

        6.Effective U-tube or mud seal configuration

        7.Skid-mounted design with lay down legs

        8.Optional elevating type

         

         

        Technical Parameters

        Model

        FLQ 800

        FLQ1000

        FLQ1200

        Vessel diameter

         Ø800mm

         Ø100mm

         Ø1200mm

        Treating capacity

         240m3/h

         300m3/h

         380m3/h

        Feed inlet

         5"

         5"

         5"

        Fluid discharge

         8"

         10"

         10"

        Vent line

         8"

         8"

         8"

        Weight

         1650kg

         2000kg

         3200kg

        Dimension

         1900×1900×5700mm

         2000×2000×5860mm

         2200×2200×6634mm

         

        Benefits

        High process efficiency during continued drilling

        Promotes safe drilling environment

        Efficient removal of free gas

        Built to match drilling program and application

        Control delivery of gas to the flare line

        Control of retention time of gas-cut mud in the vessel

        Optimizes process effectiveness and efficiency

        Easy transportation, rig-up and rig-down

        Adaptable for different drilling height or other conditions

        Message
         
        Title:
        *
        Content:
        * Entered characters:0 Word
        Less than or equal500Character
        Posted by:
         
        Less than or equal to 20 characters (including A-Z, a-z ,0-9, Chinese characters, excluding special characters)
        Your e-mail:
         
        Example: [email protected]il.com
        Cellphone number:
         
        By digital ,"+", in the bars "-" the composition, the maximum allowable 20 characters
        Telephone:
         
        Less than or equal to 32 characters (including 0-9, -, (,), comma)
        Location:
         
        Address:
         
        Verification code: