Tangshan Aojie Petroleum Machinery Equipment Manufacturing Co., Ltd.

        Your present location:HomeProductsSolid Control Equipment / Mud Gas Separator
        Products
        • Name: Mud Gas Separator

        Detailed  Description for Mud Gas Separator

        1.Control delivery of gas to the flare line 
        2.Control of retention time of gas-cut mud in the vessel

        3.Promotes safe drilling environment 
        4.Efficient removal of free gas 
        5.Control delivery of gas to the flare line

        Mud gas separator is using on the drilling site follow the mud pump. When the drilling fluid out of the well, it need to remove the gas and big bubble then the drilling fluid can be put into the solids control system.


        Features of Mud gas separator

        1.Large effective vessel capacity

        2.Removal of dangerous H2S and other poisonous gas

        3.Baffle plates in vessel

        4.Customized specification

        5.Back pressure manifold with flare ignition line

        6.Effective U-tube or mud seal configuration

        7.Skid-mounted design with lay down legs

        8.Optional elevating type

         Technical Parameters

        Model

        FLQ 800

        FLQ1000

        FLQ1200

        Vessel diameter

         Ø800mm

         Ø100mm

         Ø1200mm

        Treating capacity

         240m3/h

         300m3/h

         380m3/h

        Feed inlet

         5"

         5"

         5"

        Fluid discharge

         8"

         10"

         10"

        Vent line

         8"

         8"

         8"

        Weight

         1650kg

         2000kg

         3200kg

        Dimension

         1900×1900×5700mm

         2000×2000×5860mm

         2200×2200×6634mm

         

        Benefits

        1). High process efficiency during continued drilling

        2). Promotes safe drilling environment

        3). Efficient removal of free gas

        4). Built to match drilling program and application

        5). Control delivery of gas to the flare line

        6). Control of retention time of gas-cut mud in the vessel

        7). Optimizes process effectiveness and efficiency

        8). Easy transportation, rig-up and rig-down